Description
MCH41A0220-503-4-0C SEW Output module
Product Dimensions:
This operating instruction covers AC brake voltages with the following brake control componentsIf the brake voltage is DC, or if the brake control components differ from those listed below, an ad-ditional operating instruction must be consulted for connection information.
SEW-Eurodrive fai-safe mechanical brakes are DC controlled. Standardly, a brake rectifierhalfwave) is provided to convert the AC line voltage to the DC volae required to drive the brake. 24VDC brakes do not include a rectifer. When voltWhen yoltage (V) is removed from the brake. it will set.age ( Ve) is applied to the brake, it will release.
The brake rectifier can be wired either for normal brake reaction time (setting, stopping) or fast brake reaction time.
The wiring diagrams for brake connections are located on the inside of the motor conduitbox lid, The brake will release and allow the motor to rotate when the nameplate ACbrake volage V, is supplied to the brake rectifier terminals. There are certain cases where the brake rectifier can receive its voltage from the motor’s ter-minal block, meaning that when power is applied to the motor it will simultaneously release the brake and start the motor.
SEW products are transmission equipment in basic industries, including reducers, reducers and frequency converters. SEW’s products use a new “module combination” concept to provide a broader space for the development of electromechanical and electronic integration. Various machinery and equipment, including steel, metallurgy, cement, mining, infrastructure, building materials, environmental protection, papermaking, ports, airports, aviation, aerospace, petrochemicals, light industry, food and beverage, warehousing and logistics, etc. SEW’s products are widely used in key national engineering projects, such as major domestic ports, the Capital Airport and major domestic airports, and major sewage treatment projects; China Millennium Monument, Capital Theater, and the Great Hall of the People’s Large and Small Auditorium Renovation Projects ; Tianjin FAW, China FAW, Shanghai GM, Volkswagen, SAIC-GM-Wuling; Shanghai Maglev Train Project, Three Gorges Water Conservancy Project, Shenzhou Satellite Launcher Project; Ground Stage Drive System for the Opening Ceremony of the 29th Beijing Olympic Games, Main Torch Bearer Aerial Walk Drive System wait.
Shipping Port: Xiamen, China
Payment: Bank of Chicago, Bank of Singapore
Express cooperation: fedex, DHL, UPS and your express account
Service: Professional Sales provides 24 hours /7 days online service
Please make an inquiry for more models:
SEW | MDV60A0022-5A3-4-00 | SEW | MC07B0008-5AR-4-00 |
SEW | MDX61B0014-5A3-4-00 | SEW | MCH42A0015-5A3-4-0T |
SEW | MDX61B0022-5A3-4-00 | SEW | MC07B0015-5A3-4-00 |
SEW | MC07A015-5A3-4-10 | SEW | MDX61B0040-5A3-4-OT |
SEW | MDX60A0054-5A3-4-00 | SEW | MC07A008-5A3-4-00 |
SEW | MC07A008-2B1-4-00 | SEW | DRC1-503-SNI-A-00-A |
SEW | MDX61B0040-5A3-4-0T | SEW | MTF11A005-503-E20A-15 |
SEW | MDx60A0110-5A3-4-00 | SEW | MCV41A0015-5A3-4-00 |
SEW | MCH42A0075-5A3-4-0T | SEW | MC07A005-5A3-4-00 |
SEW | MDX61B0030-5A3-4-00 | SEW | MC07A015-2B1-4-00 |
SEW | MC07B0040-5A3-4-S0 | SEW | MDX61B0008-5A3-4-00 |
SEW | MC07A011-2B1-4-00 | SEW | MC07B0005-5A3-4-00 |
SEW | MDS60A0015-5A3-4-OT | SEW | MM03C-503-00 |
SEW | MDV60A0015-5A3-4-0T | SEW | MC07A004-2A3-4-00 |
SEW | MDV60A0110-5A3-4-0T | SEW | MC07B0011-2B1-4-00 |
SEW | MCH42A0030-5A3 | SEW | MDX61B0005-5A3-4-0T |
SEW | MCF41A0015-5A3-4-00 | SEW | MC07B0003-503-4-00 |
SEW | MTM11A000-E20A | SEW | MDX61B0005-5A3-4-00 |
SEW | MDF60A-0015-5A3-4 | SEW | MC07B0003-5A3-4-00 |
SEW | MDX61B0015-5A3-4-OT | SEW | MC07B0004-5A3-4-00 |
SEW | MDX61B0015-5A3-4-00 | SEW | MC07B0005-2B1-4-00 |
SEW | MDX61B0005-5A3-4-OT | SEW | MDX60A0055-5A3-4-00 |
SEW | MDX61B0015-5A3-4-0T | SEW | MC07A011-5A3-4-00 |
SEW | MDS60A-00 | SEW | MDX61B0008-5A3-4-0T |
SEW | MDV60A0055-5A3-4-00 | SEW | MDX61B0014-5A3-4-0T |